THE LAST BOND BEAM--AGAIN
#*!!$%#$!!$#&#$!!!
THIS BOND BEAM IN THE GARAGE  REALLY IS THE LAST ONE.
IT BETTER BE, THE GUYS ARE GETTING WISE. SOME MORE THAN OTHERS---EDDY  HAD AN APOINTMENT THAT "CAME UP",
AND RIGO IS STILL NAIING DOWN LATILLAS.
AND ME ? I HAVE TO RUN THE CAMERA. AGAIN .

THE BLACK PLASTIC HANGING OUT FROM UNDER THE FORMS COVERS THE
WOOD LINTELS AND HELPS PREVENT THE WATER IN THE WET
CONCRETE FROM STAINING THEM.

THE GARAGE IS THE ONLY PLACE IN THE ENTIRE HOUSE THAT WILL HAVE DRYWALL CEILINGS, WHICH MEANS WE WILL BE USING JOISTS THAT WE ARE HAVING DELIVERED FROM MY  SUPPLIER, BALDRIGE LUMBER
AFTER HOISTING ALL THE BEAMS AND VIGAS INTO PLACE BE HAND,
INSTALLING THESE WILL BE A PIECE OF CAKE EVEN THOUGH THEY ARE TWENTY SIX FEET LONG.