SETTING BLOCK |
|||
![]() |
|||
AFTER PLACING THE CONCRETE INTO THE FOOTINGS, WE SET THE FIRST COURSE OF THE CONCRETE BLOCK STEM DIRECTLY INTO THE WET CONCRETE. IT SAVES A TON OF TIME, AND THE BLOCK BONDS BETTER TO THE FOOTING. NEXT WE STICK THE VERTICAL " L" SHAPED REBAR INTO THE WET CONCRETE THROUGH THE OPEN CELLS OF THE CONCRETE BLOCK. TIP OF THE DAY: WE USE 4 INCH HIGH BLOCK (LOWBOYS ) FOR THE FIRST COURSE. THE LIGHTER WEIGHT ALLOWS US TO WORK FASTER, AND THEY ARE LESS PRONE TO SINKING INTO THE WET CONCRETE. |
|||