SETTING BLOCK
AFTER PLACING THE CONCRETE INTO THE FOOTINGS, WE SET THE
FIRST COURSE OF THE CONCRETE BLOCK STEM DIRECTLY INTO THE
WET CONCRETE. IT SAVES A TON OF TIME, AND THE BLOCK BONDS
BETTER TO THE FOOTING.  NEXT WE STICK THE VERTICAL
" L"  SHAPED REBAR INTO THE WET CONCRETE THROUGH THE OPEN
CELLS OF THE CONCRETE BLOCK.

TIP OF THE DAY: WE USE 4 INCH HIGH BLOCK (LOWBOYS ) FOR THE
FIRST COURSE. THE LIGHTER WEIGHT ALLOWS US TO WORK FASTER,
AND THEY ARE LESS PRONE TO SINKING INTO THE WET CONCRETE.

CLICK HERE FOR THE NEXT PHASE

RETURN TO THE MENU