BEAMS AND VIGAS
ON THIS PORTION OF THE HOUSE, WE ARE CLOSE TO BEING READY TO NAIL DOWN THE PLANK DECKING. THE ADOBE WALLS HAVE BEEN BLOCKED, BUT WE STILL NEED TO DO THE BLOCKING ON THE FRAME WALLS.
ON THE RIGHT SIDE OF THE PHOTO ABOVE, YOU CAN SEE THAT THERE IS STILL A PORTION OF WALL THAT NEEDS A BOND BEAM.
WE WILL GET IT READY TO POUR AT THE SAME TIME WE DO THE
LIVING ROOM BOND BEAM. THAT WAY THERE WILL BE ENOUGH CONCRETE SO I CAN ORDER IT, AND SAVE SOME WEAR AND TEAR ON THE CREW...
AND AVOID  A STRIKE.